PROJECT: Replace the facing on the studio outside
The Mission: The exterior of the studio front is falling apart. The mailbox is currently mounted on what seems to be a melange of water damaged wood that is currently flaking off the building. This project proposes that we tear off all the existing junk from the the front area and replace it with plywood sheet that we can seal and paint.
PROJECT DETAILS
Skills Required:
Simple construction
Tear down
Tool Use Needed:
Circular saw with Fine Tooth Carbide Blade - $15
Level
Screw Gun
Pry Bar/Hammer
Caulk gun
Cost/Materials Needed:
Two 4' x 8' sheets of 3/4" MDO (Medium Density Overlay) - G1S (Good 1 Side) @ $90/ea ($180)
Exterior Primer and Paint (Planet Ant Black/Grey) ($60)
Stainless Steel Trim Screws (8 x 2" - won't rust/bleed) ($25)
10ft Aluminum Z-Flashing/Drip Edge ($15)
Exterior Grade Silicone Sealant/Caulk (for mailbox mounting and seams) ($25)
Truck Rental (Flatbed/Van for 8' sheets) ($100)
Misc (Sandpaper, brushes/rollers, rags) ($20)
💵ESTIMATED PROJECT COST - $525💵
PROJECT KEY:🟠NEEDS RESOURCE | 🟢READY TO GO | 🔵COMPLETE
PROJECT NEEDS
🟠 VOLUNTEERS | 3 General Labor Volunteers | ⏱️ 4 Hours | Payout: 💰 60 Ant Bucks
🟠 FUNDING | 💵TOTAL PROJECT COST - $0💵
🟠 SCHEDULING | No Date Scheduled Yet
Note: Most projects are scheduled for weekends during daytime hours. If you have limited hours or a different availability please jump into our Discord.