PROJECT: Drywall upper area in front room of Ant Hall
The Mission: The front room of the Ant Hall is a big problem for sound bleed. The upper area (currently the back of the equipment storage area) needs to be drywalled and studded to block sound for the rest of the hall. The wall area will need to be framed with 2×4s and have drywall applied. The area is approx 9ft in the air and will need ladder use to help facilitate the construction. The wall can also be reached from the equipment storage. There is currently some wood in that area that doesn’t seem to be doing much.
This project is just for the initial construction and does not include painting, sanding, or mudding.
PROJECT DETAILS
Skills Required:
Heavy lifting
Measurement
Simple construction
Tool Use Needed:
Screw gun
Saw
Cost/Materials Needed:
3 4×8 drywall sheets ~$50
screws and tape ~$30
6 studs ~$50
💵ESTIMATED PROJECT COST - $130💵
PROJECT KEY:🟠NEEDS RESOURCE | 🟢READY TO GO | 🔵COMPLETE
PROJECT NEEDS
🟠 VOLUNTEERS | 2 General Labor Volunteers | ⏱️ 3 Hours | Payout: 💰 45 Ant Bucks
🟠 FUNDING | 💵TOTAL PROJECT COST - $130💵
🟠 SCHEDULING | No Date Scheduled Yet
Note: Most projects are scheduled for weekends during daytime hours. If you have limited hours or a different availability please jump into our Discord.